It's May, the sun is out and we are feeling generous here at OLP!  We are offering a free Balance Station (worth £468) with any Standard Trim trail ordered that is quoted in May 22.  The Balance Station is a free standing unit that works well as an add-on to your trim trail, either at the beginning, the end - or even in the middle!  And if you are quick, there is still some availability for summer holiday installation.

We have a choice of six fantastic trails to choose from, giving a range of shapes, sizes and activities to suit every budget.

The Mount Aso Trail is ideal for smaller areas, with a range of rope, timber and hdpe activities that provide a challenge, without taking over your playground. The Mayon Trail is suited to Key Stage 1 children with lower level activities and is one of our mid budget trim trails.
The Irazu Trail is one of our most popular trails, with a wide range of simple and more challenging activities.  An example of this trail is shown in the photograph at the beginning of this article. The Hekla Trail is another of our mid range linear trails, providing a range of activities for children.
The Mauna Loa is a cross shaped trail which allows children to enter from all directions. The St Helen's is our top of the range trail, with 15 different activites, it works for all levels of primary school children.

If you are interested in finding out more about any of these trim trails then please Contact the office and a member of our team will be able to help you.  All our trim trails are manufactured to order with a lead time of approximately 6 weeks depending on seasonal demand.